Page 23 - Inside K&A - March 2019
P. 23

"VALLETTA, LOCATED
                                                                                    AT THE CENTER OF
                                                                                    THE MEDITERRANEAN
                                                                                    SEA REPRESENTS
                                                                                    A GREAT GROWTH
                                                                                    OPPORTUNITY FOR
                                                                                    MALTA, NAMED THE
                                                                                    EUROPEAN CAPITAL OF
                                                                                    CULTURE."

                                                                                    Shadi Sabra, Geotechnical &
                                                                                    Heavy Civil Project Manager






















          fortification wall. The master plan design
          of the upper part, spanning an area of
          approximately 25 meters above sea level, will
          be developed as townhouses overlooking the
          Grand Harbor. It will also incorporate a series
          of historic underground tunnels. The lower
          part is envisioned as a business park with
          recreation and leisure facilities.
          REDUCING WAVE AGITATION
          LEVELS NEAR THE HARBOR

          A particular challenge facing K&A’s experts is
          solving the “wave agitation” at the entrance
          of the harbor, which disrupts the navigation
          and berthing of vessels in harsh weather
          conditions, leaving a large part of the
          shoreline unusable.
          K&A is reviewing the current phenomenon
          in order to propose mitigation measures and
          design a wave attenuation structure that is
          cost efficient, constructible and sustainable.
          Easing navigation through the Valletta
          Grand Harbor entrance for incoming vessels
          will help minimize risk for operators during
          windy conditions and reduce the operational
          requirements currently being applied by
          the Harbor.
          Valletta’s revitalized waterfront and offshore
          area will present new opportunities for the
          Maltese government to regain valuable
          space for future investments, supporting the
          country’s long-term growth and prosperity.
   18   19   20   21   22   23   24   25   26   27   28